Here are some training competencies that a user should know to use the quoting system effectively
Creating a New Quote
- Create a quote from the main menu
- Copy an existing quote to a new Quote
Adding Items to The Quote Grid | Step-by-Step Guide
Adding Products to the Quote
- Press the product button
- Select a product from the dropdown list - applying filter
- Complete the Wizard question
- Add the product to the quote grid
Starting with a Blank Recipe
- Press the blank recipe
- Build the quote with the calculator
-
Inserting-Updating the quote values
Editing the Quote Grid
- Editing the quote line description
- Changing the unit cost or total
Editing the Calculator | Step-By-Step Guide
Summary Section
- Changing size or quantity
- Meaning of the GP Calculation
Materials Section
- Opening the Calculator
- Replacing a material on a row
- Adding a new Material to the quote
- Overriding the quantity or total
- Locking a material to prevent price updates
- Understanding the principle of Locking a material to prevent size updates
- Drilling into the source material from the material row
- Accessing the advanced settings
- Re-ordering the material list
Operations Section
- Adding a new operation/process
- Applying a process preset to an existing material
- Overriding the calculated time or total cost
- Changing setup and run rates
- Changing the order of operations
- Drilling into the master process from the preset
More - Imposition
- Finished size vs Worksheet sizes
- Imposition
Comments
0 comments
Article is closed for comments.